membership is free join now

  • HOME
  • The Project
    • About The Project
    • Support the Project
    • Site Credits
    • Location
  • Timeline
    • 1790 - 1850
    • 1850 - 1900
    • 1900 - 1950
    • 1950 - 2000
    • 2000 - NOW
  • Minebase
    • Minebase A - C
    • Minebase D - L
    • Minebase M - S
    • Minebase T - Z
    • Feature: Nebo
  • Galleries
    • Submit Your Photos
    • Aerial Pics
    • Machinery / Equipment
    • Maps and Plans
    • Geological Sections
    • Media
    • Miscellaneous
    • People
    • Surface Pics
    • Underground Pics
  • Resources
    • Current Sponsors
  • Contacts
Category: Timeline

1850

1855 Shoobert’s Mine (aka Albert Mine) - closes 17' seam (Wongawilli ), 4'2" seam ( Balgownie) still producing still low. (SMH-27thSept).
1856 Albert Mine - plus Mt. Keira home (137 acres) auctioned by Rod Shoobert
1857 Osborne-Wallsend Colliery in third & uppermost seam, 8' (2.1m), located on eastern face of Mt. Keira. In this 8' seam was second coal mine, owned by Henry Osborne.
1857 Osborne-Wallsend Colliery - the first coal from this the No. 1 or Bulli seam was shipped on April 16.
1857 Bellambi Colliery - (aka Hale's, Woonona & Model Colliery) started by Thomas Hale in 8' seam.
1857 First coal shipped from Bellambi Harbour (17/12/57)
1857 Henry Osborne purchases 1/2 of Hale's Bellambi property for $14,000
1858 Russell-Vale Colliery opens at Bellambi ??
1858 Bellambi No2 Colliery - commences (Taylor, Walker & Longmore) 1 mile north of Bellambi Colliery
1858 Bellambi Cove - used for cedar - attempt to build jetty
1859 Bellambi mine - Henry Osborne acquires 1/2 share.
1859 Osborne - Wallsend Coal Mine Co. formed to build tramway to Wollongong (Capital of $500,000)
1859 Osborne-Wallsend Mine - Henry Osborne dies, taken over by Osborne-Wallsend Co.

1860

1860 Thomas Hale engages man to sink shaft near Woonona Post Office - 6' of coal, 12' below surface.
1861 Bulli Colliery - opened
1861 Tunnel driven at site of Old Bulli Mine??
1861 Mt. Pleasant Colliery - opened by Lahiff & Fawcett for Illawarra Coal Co. on Mr. Plunkett's property.
1861 Bulli & Bellambi Coal Co. incorporated
1861 Russel Vale Colliery - proposed
1861 Construction starts on Mt. Keira tramway
1862 Russel Vale Colliery - opened on Osborne's land by Taylor & Walker
1862 Mt. Pleasant - Tramway built to Wollongong Harbour
1862 Bulli Colliery - coal shipped to Ballarat
1862 Bellambi Colliery & Woonona Coal Mine - Thomas Hale becomes insolvent.
1863 Bellambi Cove - attempt to build jetty
1863 Bellambi Colliery - (aka Hale's Mine & Woonona Mine) closes (bankrupt), (reopens off & on over next 60 years)
1863 Old Bulli Colliery - officially commences June 23rd
1863 Bulli Bight - major attempt to build jetty - washed away within 12 months
1863 Bulli jetty - Schooners "Moselle", "Tiger" & "George" commence operations, Bulli to Port Jackson.
1863 Screw Steamer "Woniora" commences making 3 trips per week to Sydney.
1863 "Ironside" (June) 790 tons to Shanghai from Bulli jetty.
1863 Bellambi Colliery - closes for 25 years ??
1863 "A drift is working 4 miles south of Dapto & more than 20 miles south of Mr. Hales" - Gov. Examiner of Coalfields
1864 Russell Vale Colliery – closed due to depressed market, attempt to reopen fails
1864 Bellambi Colliery - reopens ?? by Bulli & Bellambi Coal Co. Merges w/- Sth. Bulli Colliery
1864 250' of Sandon Point (Bulli Colliery) jetty washed away in June - mining ceased until repaired
1864 Bellambi Cove - jetties abandoned
1865 Pioneer Kerosene Works - opened, owner John Graham Jnr. Mt. Kembla, American Ck seam
1866 HM "Tiger" - January, washed ashore at Bulli - loss of 3 lives.
1867 Mt. Pleasant Colliery – acquired by James & William Byrnes
1867 Bulli & Bellambi Coal Co. formed with capital of $60,000 - obtained 600 acres from O'Brien and Messrs Somerville & Black.
1867 Osborne-Wallsend Colliery - Messrs. Tulip, Nixon & Jackson sell interest to Messrs. Robson & Spiers.
1867 Bulli Colliery - steam locos introduced.
1867 "Moselle" - Mar. stranded on beach at Bulli.
1867 "George" - May, 22, smashed on beach at Bulli.
1867 Bulli Bight - Part of Sandon Point (Bulli Colliery) jetty rebuilt - washed away June 21st. (4 men died), 40 wagons lost
1867 "Matador" - lost on Bulli beach - Sept. 7th.
1867 "Bright Planet" - lost on Bulli beach - Sept. 7th.
1868 Wollongong Harbour basin complete.
1868 "Barwon" commences coal trade to Sydney from Bulli jetty.

1870

1870 Towradgi or Balgownie tunnels reported upon - became Corrimal Colliery in 1883
1871 Messrs. Robson & Spiers retires, Osborne-Wallsend Colliery reverts to Osborne family.
1871 Bulli Jetty in use (fig.11 "History of Coal Mining in Australia")
1871 "Barwon" wrecked.
1873 Mt. Pleasant Colliery - installs self acting incline (fig 13 HCMA) from "Sydney Mail"
1873 SS "Bulli" - arrives at Bulli Jan. 22 (500 ton cap.) from Plymouth.
1875 Pioneer Kerosene Works - operations suspended.
1875 SS "Woonona" - arrives Dec. for Bulli - Melbourne - Adelaide trade
1876 SS "Merksworth" - arrives for Bulli - Melbourne - Adelaide trade
1876 Pioneer Kerosene Works - operations reopened
1876 North Bulli Coal & Iron Mining Co. formed to open mine on North Bulli Estate see 1902
1876 Osborne erects coke ovens near Wollongong using colliery slack coal.
1877 SS "Bulli" - lost July on voyage to Tasmania.
1878 Nth Bulli Coal & Iron Co. opens a mine near Coledale
1878 Coalcliff Colliery – commences - January - (Coalcliff Mining Co) 6 miles north of Bulli Pass – by Clarke & Robertson, Thomas Hale as manager.
1878 Pioneer Kerosene Works - operations closed
1878 Mt. Kembla - The Mt. Kembla Coal & Oil Co. Ltd. formed to work coal from the property producing kerosene shale.
1878 A "Nth Bulli Colliery" (aka Coledale Colliery) commences (lasted 25 yrs) replaced by B pit (Nth Bulli)
1878 Coal Cliff jetty built - washed away 5 months later
1878 Steam locos replace horses on tramways
1878 Mt. Keira Colliery - ventilation headings called; Pratts (horse access); Porters; Rings; McGoldricks.
1879 Mt. Keira Colliery - steam locos introduced (Keira No.1 & No.2)
1879 Coalcliff Colliery - installs Furnace Ventilation

1880

1880 Corrimal Colliery - opens at Mt. Corrimal ??
1880 Clifton Colliery - opens
1880 Coalcliff Colliery - Charles Harper replaces Thomas Hale as manager
1880 Mt. Kembla Mine - opens but short of capital - company then formed in England.
1881 Coal Cliff jetty rebuilt - washed away - mine closed for 4 months
1882 Bulli Colliery - tunnel into Balgownie seam
1882 Woonona Old Tunnel Colliery - opens.
1882 "Woniora" - Oct 28, founders off Botany Bay - loss of 17 lives
1882 Mt. Kembla Colliery - opens in 7' seam. (5 good seams of coal) - jetty built.
1883 Coalcliff Colliery - Charles Stuart replaces Charles Harper as manager
1883 Corrimal Colliery - opened by Thomas Bertram
1883 Mt. Keira Colliery - No.1 shaft sunk to #2 seam (102m) & fitted w/- steam driven Walker fan, 12' dia. 100,000 cfm '@ 3/4" water gauge, replacing 3 furnace shafts
1883 Mt. Kembla Colliery - steam locos introduced
1883 Mt. Kembla jetty - at Five Islands Point (Pt. Kembla) built - 6m water & 120t/hr.
1884 North Illawarra Coal Co. proposes to open 3 mines on Westmacott’s (between Excel No 2 & Nth Bulli)
1884 North Illawarra No. 1 Colliery - opens on site of old colliery started in 1878 by Nth Bulli Coal & Iron Co.
1884 South Cumberland Coal Mining Co. - formed to mine coal at Camp Ck.
1884 Long Point Jetty - Nth Illawarra Coal Co. - Austinmer built
1884 Corrimal Colliery - sold by Thomas Bertram to Southern Coal Co. ( incorporated in Eng.)
1884 Austinmer Colliery - steam locos introduced
1884 Mt. Pleasant Colliery - steam locos introduced
1884 Brokers Nose Colliery - proposed
1885 Brokers Nose Colliery - commences July (Brookers Nose Coal Co. sic)
1885 Bulli (Sth) - (Russell Vale Colliery site) commences
1886 Russell Vale Colliery - reopens as Sth Bulli Colliery under Thomas Saywell
1886 Nth Mt. Pleasant Mine - opens 2km north of original site.
1886 Bulli A & Bulli B - both working
1887 Bellambi jetty - Sth Bulli Colliery - built w/- 6.9m water loading @ 200 t/hr
1887 Sth Bulli Colliery - first coal shipped in November
1887 Bulli Colliery - 86 lives lost in explosion at 2.30 pm March 23rd.
1887 Bellambi Colliery - steam locos introduced
1887 Austinmer Colliery - (aka Westmacott’s) commenced
1887 Long Point Jetty - 8m water @ high tide - load @ 120t/hr - "Waratah" wrecked.
1887 Five Islands Point - Southern Coal Co. - jetty built.
1888 Bellambi Coal Co. established 
1888 Corrimal Colliery - taken over by Southern Coal Co. 
1888 The Mt. Pleasant Coal & Iron Mining Company Ltd. Established 
1888 Helensburgh Colliery - opened in March. 
1889 Bellambi - second jetty built 
1889 Model Colliery - opens Nov 9, on same site as Woonona (Hales) Old Tunnel Colliery - by Bellambi Coal Co.. 
1889 South Bulli Colliery - reopens (William Wilson, Manager) employing 270 men 
1889 Woonona Colliery - steam locos introduced 
1889 Mt. Pleasant Coke Ovens - opens in Nth Wollongong. (next to railway bridge) 
1889 Coalcliff Colliery - virtually closes 
1889 Brokers Nose Colliery - closes, Sth Bulli & Brokers Nose Co. combine- renames mine " Corrimal Colliery" 
 
1890

1890 Corrimal Colliery - purchased by Southern Coal Co.(Ill. Mercury. 7/1/90) 
1890 Sth Bulli Colliery - purchased by Ebenezer Vickery 
1890 Another Mt. Kembla Mine? - opened in 1887 ( Sthn Coal Co.) - closes 
1890 Ocean View Colliery - opened by Illawarra Harbour & Land Corp. sth of Mt. Kembla. Connected to the western shore of Lake Illawarra by 10.8km railway - rail crossing opened in 1895 but closed in 1902 - jetty idea abandoned due to problems dredging lake. Decision then made to make Pt. Kembla coal loading point. 
1891 Corrimal Colliery - taken over by Corrimal-Balgownie Collieries (subsequently Corrimal Coal & Coke Pty Ltd.) 
1891 Sth Bulli Colliery - small explosion kills 1 man 
1891 South Clifton Colliery - opens 
1892 Coalcliff Colliery - purchased by Ebenezer Vickery & John Keir Clark 
1892 South Clifton Colliery - opens 
1892 Mt. Kembla Colliery - 12.5 km railway to Red Point (Pt. Kembla) 
1893 Tongarra Colliery - started by William Brownlee (@ 800' asl) Aug. - 40' into "the purest & best gas coal some 22' thick." 
1893 SS "Woonona" - wrecked at Fitzroy River 
1895 Original Austinmer Colliery - closed 
1896 Unanderra Coke Works (Southern Coal Co.) closes. 
1898 Wiley Mine - (fig. 66 "History of Coal Mining in Australia") Showing mine in use. 
1898 A more northerly mine to Austinmer Colliery opened of smaller size 
1898 The Mt. Pleasant Coal & Iron Mining Co. formed (public company) 
1898 Nth Illawarra Colliery - closes 
1898 Bellambi's second jetty destroyed with loss of collier - abandoned. 
1898 Long Point Jetty - destroyed 
1899 Bulli Pass Colliery - (1/2 coke; 1/2 coal) v. little work carried out. Became part of Excelsior Colliery 
1899 Unanderra Coke Works (Southern Coal Co.) reopens. 
1899 Coalcliff Colliery - furnace ventilation ceases 
1899 Mt. Keira Colliery - 8th Nov - purchased by Ebenezer Vickery & Sons from Osborne family 
1899 Mt. Keira Colliery - 8th Dec - John McGeachie appointed manager. 
 
PREVIOUS PAGE ... NEXT PAGE
 
Last Updated: 11 July 2010
Discuss this article
Log in to comment
Category: Timeline

1790

1791 First discovery of coal in Australia at Newcastle by escaped convicts.
1797 Illawarra coal deposits first officially documented by George Bass (near Coalcliff)

1820

1821 O'Brien, Cornelius - granted 300 acres in the vicinity of Bulli
1828 Australian Agricultural Co. has monopoly on coal - Shoobert is blocked from opening a coal mine.

1830

1836 Westmacott, Capt. Robert Marsh - purchases 300acres land from Cornelius O'Brien
1837 Plunkett, John Herbert - on his property "Keelogues" ("Gundarun") 1280acres
1837 Construction starts on Belmore Basin, Wollongong Harbour
18xx Wylie, John obtains 2000 acres ("Dunlop Vale", north of Mullet Ck., Dapto) then loses it to Andrew Lang, the father of Rev. Dr. D. J. Lang.
1839 Australian Agricultural Co. complains that Capt. Westmacott has opened mine at Bulli on land purchased from O'Brien (not proceeded with)
1839 Rev. W. B. Clark, Geologist, commences examination of South Coast coal measures.

1840

1841 Owen, Robert purchases coal land
1844 Construction of Belmore Basin completed.
1846 Owen, Robert (later Judge Owen), purchases land at Jamberoo
1848 Albert Mine (aka Shoobert’s Mine) - Tunnel in 5m seam (Wongawilli sm.) under Mt. Keira by James Shoobert.
1849 Albert Mine (aka Shoobert’s Mine) - Tunnel in second seam (1.2m), the 4' seam (Albert sm.), located above first.
1849 First coal mined for sale taken to Wollongong harbour by horse dray (27th August) by James Shoobert. Mined from the 4' seam.
1849 Wollongong Bay - first coal mined, loaded on SS "William the Fourth"


 

Last Updated: 19 April 2017
Discuss this article
Log in to comment
Discuss this article in the forums (1 replies).
Category: Timeline

1900

1900 South Clifton installs coke ovens adjacent to railway
1900 Excelsior No.1 Colliery - commences - J. S. Kirkton (just north of Bulli Pass)
1900 South Bulli Colliery - sold by Ebenezer Vickery to Bellambi Coal Co.
1901 Mt. Keira Colliery - 21st May - John McGeachie replaced by Jacob Carlos Jones (ex manager of Sth Bulli & Austinmer Collieries.
1901 Mt. Keira Colliery - purchased by Ebenezer Vickery from the Osborne family
1901 South Bulli Colliery - sold by Ebenezer Vickery to Bellambi Coal Co.
1902 Nth Bulli (new) Colliery - opened immediately above Coledale railway station under the control of Hyde & Cater, on the site of previously abandoned mine
1902 Coalcliff Colliery - purchased by E. Vickery & Sons
1902 Sth Bulli Colliery - purchased by Bellambi Coal Co.
1902 Government takes over Southern Coal Co.
1902 Mt. Kembla Colliery - disaster July 31st.- 95 men died - mine reopens 24th Sept.
1903 Tongarra Colliery - Percy Owen takes over from William Brownlee as mine operator.
1904 Tongarra Colliery - in 300' from outcrop. Murray Brownlee manager for Yuill & Co. of Corrimal
1904 Coalcliff jetty lost in storm (150')
1904 Black Ball Colliery - (Pors. 82 & 83 Woonona) 7' seam dirty. Probably Plunketts Hill or Tongarra seam
1905 Excelsior No.2 Colliery - commences - Ryan (immediately below Bulli Pass Lookout) Combined w/- Excelsior No. 1
1906 Corrimal Colliery (aka Brokers Nose) - 91' upthrow fault encountered - new entrance established 1.5 km sth - by G. S. Yuill & Coy. Pty Ltd. and to be known as Corrimal-Balgownie Colliery
1907 Bulli Bight - jetty rebuilt - damaged
1908 Corrimal Colliery - 780' x 14' vent shaft (#1) sunk. Fitted with Sirocco, 91" dia. double inlet fan
1908 Tongarra Colliery - further development by Percy Owen
1908 Sth. Clifton Tunnel Colliery - opened
1909 Coalcliff Colliery - purchased by Coalcliff Collieries Ltd.
1909 Balgownie Colliery (Owen's) - commenced near Mt. Pleasant in 4' seam.
1909 Bulli Colliery - delay due to basalt dyke encountered
1909 Bellambi jetty - rebuilt

1910

1910 Coalcliff jetty - abandoned
1910 Tongarra Colliery (Owen's) - commenced. Operated till early 1920's
1911 Coke ovens erected near Corrimal by Southern Coal Co. moving from Unanderra
1912 Australian Coke Making Co. at Unanderra closes.
1912 Sth. Clifton Colliery - tunnels driven to replace shafts.
1912 Bulli Bight - jetty rebuilt - damaged
1913 Balgownie Colliery (Owen's) - closed
1913 Mt. Kembla Colliery - Mount Kembla Collieries Ltd. takes over. (until 1946)
1914 Tongarra Colliery - 6 ton sample to Sydney w/- prospect of supplying railways - did not succeed in bid.
1915 Wongawilli Colliery - opens in Wongawilli seam
1916 Five Islands Point jetty in constant use till now.
1916 Wongawilli Colliery - holdings purchased by G & C Hoskins & Development commenced
1917 Bulli Colliery - coal cutters withdrawn due to concern with dust & gas.
1917 Woonona Colliery - closes??
1918 Part of Brokers Nose collapses in large land slip.
1919 South Clifton Colliery - closes, plus the 32 coke ovens . Remaining coal to be extracted by the adjoining mine at Wombarra.

1920

1920 Wongawilli Colliery - Washery (first on Sth Coast) installed plus 40 coke ovens
1920 Mt. Kembla Colliery - Machines withdrawn - concern with dust & gas.
1920 Illawarra Colliery - Illawarra Coal Co. acquires leases & opens colliery (by 1933 known as PK 2 Colliery
1920 South Clifton Shaft closes down.
1920 Bulli Jetty still in use (fig.97 CMHA)
1921 Metropolitan Colliery - Huddart Parker Ltd. takes over
1921 Mt. Kembla Extended Colliery (previously Owen's Balgownie Colliery) opens
1922 Bellambi Colliery - closes (Sth Bulli ???)
1924 Clifton Jetty - demolished
1925 Wongawilli Colliery - additional 40 coke ovens installed
1925 Bulli Colliery - delayed when cinder encountered
1925 Corrimal Colliery - 1120' x 17' vent shaft (#2) sunk.
1925 Metropolitan Colliery - CO2 outburst, 200 tons, kills 2 miners.
1925 Mt. Kembla Colliery - replaces furnace with fan.
1925 Five Islands Point jetty derelict until 1925 (9m water @ low tide & load coal @ 300t/hr)
1926 Nth Bulli Colliery - closes. (reopened on small scale later)
1927 Nth Bulli Colliery - closes.
1929 South Bulli No 1 Shaft reaches coal.

1930

1932 Parke’s Tongarra opens. Works for ~ 2 years.
1933 Sth Kembla Colliery (adjoining Wongawilli Colliery to the north, acquired by G & C Hoskins
1933 Mt. Pleasant Colliery closes.
1934 Mt. Pleasant Colliery goes into liquidation.
1934 Mt. Pleasant Colliery (Nthn side of Mt. Keira) purchased by E. Vickery & Sons 10/9/34
1935 Mt. Pleasant Colliery taken over by Vickery & Sons (except MP.16) and renamed Keira Pleasant Tunnels
1935 Wongawilli Colliery & Pt Kembla Steelworks - purchased by BHP
1936 Old Bulli Colliery - purchased by AIS
1936 Mt. Kembla Extended Colliery - closes.
1936 Wongawilli Colliery - longest haulage incline in world installed.
1937 Mt. Keira Colliery - purchased by AIS on 26th January (includes Mt. Pleasant Colliery) from Vickery & Sons
1937 Mt. Keira Colliery - holes into Mt. Pleasant Colliery (5NE hdg in MP.15) 5th August
1938 Coke works at Wongawilli Colliery closed - reopens in 1941 because of wartime demand
1938 Mt. Pleasant Power Station restarted to supply Mt. Keira Colliery
1938 Mt. Keira Colliery - Samson Coal Cutter, Blackett Conveyor & 9x Sullivan Coal Cutter introduced
1939 Corrimal Colliery - Jeffrey cutters introduced

1940

1940 Tongarra Colliery - purchased by Excelsior Collieries. (Parkes )
1940 Mt. Keira Colliery - takes electric power from steelworks
1940 Metropolitan Colliery - 8BU loaders introduced
1940 Mt. Kembla jetty condemned.
1941 Wongawilli Colliery - Coke works reopens
1941 Prospecting in #3 seam at Mt. Keira & Mt. Pleasant by BHP for future utilisation
1941 Port Kembla No 2 - Colliery opens
1942 Mt. Keira Colliery - operates diesel locos u/g
1942 North Bulli Colliery - re-opens
1943 Tongarra Colliery purchased by Excelsior Collieries of Thirroul. (R. Fullager then A. Smith as manager ).
1943 Bulli jetty at Sandon point washed away in storm - abandoned (8m water at jetty & loaded @ 120t/hr)
1944 Coal Cliff Colliery taken over by Commonwealth Coal Commissioner
1945 Mt. Kembla Colliery purchased by AIS Ltd. (until 1970)
1946 Nebo Colliery opened by BHP in Wongawilli seam (using track mounted mechanisation)
1946 Mt. Keira Colliery - operations started in Wongawilli seam in April (in addition to Bulli seam)
1946 Huntly Colliery commences as small, privately owned mine by Waugh Bros.
1947 Wongawilli Colliery - track mounted machine loading introduced
1947 Tongarra Colliery - May - G. Roberts takes over from A. Smith as manager
1947 Sth Bulli Colliery - scraper loaders introduced
1947 Coal Cliff Colliery - control by Commonwealth Coal Commissioner lifted
1948 Coke works & washery at Wongawilli closed
1948 Excelsior No.1 Colliery closes
1948 Kembla - Keira Tunnel - work commences
1949 Bulli Colliery - contract mining ceases
1949 Kembla - Keira Colliery (Kemira Colliery) - contract mining ceases
1949 Kembla - Keira Colliery fully mechanised
1949 Bulli Colliery - coal cutters withdrawn due to concern with dust & gas.
1949 Woonona Colliery - closes??
 

Last Updated: 25 April 2017
Discuss this article
Log in to comment
Category: Timeline

2000

2000 - Avon Colliery closure April 2000 due to the loss of markets, was rapid, portals sealed within days and the equipment being auctioned off on 25th May, 2000.

2003 – Corrimal No 3 Shaft fan shut down (but shaft remains open as naturally ventilating U/C shaft) as redundant when Cordeaux Colliery reverts to care and maintenance status. (B.S.)

2005 – Corrimal No 2 Shaft is backfilled and concrete capped and the site rehabilitated. (contractors - Select Civil). (B.S.)

2006 – Representatives from Gujarat NRE explore the mine workings of Avondale Colliery after nearly a month of reopening the seals.

2010

2013 – Corrimal No 3 Shaft acting as the upcast (natural ventilation) for Cordeaux Colliery. (B.S.)

2013 – Corrimal No. 2 Mine furnace shaft “rediscovered”. (B.S.)

2015 – Appin Colliery follows South32 when that company is demerged from BHPBilliton in May 2015.

2017 – Corrimal No 3 Shaft still acting as the upcast (natural ventilation) for Cordeaux Colliery. (B.S.)

Last Updated: 24 July 2017
Discuss this article
Log in to comment
Category: Timeline

1950

1950 Mt. Keira Colliery - operations abandoned in Wongawilli seam on Sept. 6th.due to excessive water & bad roof.

1950 Mt. Pleasant Colliery - #3 seam production commences on 16th Dec. to make up for loss of #3 seam at Kemira Clly

1950 Sth Clifton Colliery - taken over by Joint Coal Board

1951 Huntly Colliery - purchased by Joint Coal Board

1951 Coal Cliff Colliery - Samson Cutters & Goodman duck-bill Loaders introduced

1952 Nebo Colliery - replaces track mounted with trackless mechanisation

1952 Huntley Colliery - Continuous Miners introduced. Joy CM cuts and loads 32 tons Tongarra sm. coal (15/7/52)

1952 Wongawilli Colliery - Continuous Miners introduced

1952 Huntly Colliery - production ceases. New Huntley Colliery (on same site) expands.

1953 Last shipment of coal from Bellambi Jetty

1954 Kembla - Keira Tunnel - completed

1954 Huntley Colliery - control taken by Electricity Commission

1954 Sth Bulli Colliery - scraper loaders replaced with Jeffrey equipment

1954 Coalcliff Colliery - Duck-bill loaders withdrawn

1954 Coalcliff Colliery - purchased by Kembla Coal & Coke

1954 Metropolitan Colliery - 3600' drift replaces downcast winder

1954 Sth Clifton Colliery - purchased by S & M Fox

1954 Sth Clifton Colliery - conveyor belts replace endless rope

1954 Bellambi jetty abandoned

1955 Corrimal Colliery - old incline replaced by new incline direct to colliery

1955 Sth Clifton Colliery - Continuous Miners introduced

1955 Old Bulli Colliery - Continuous Miners introduced

1955 Nebo Colliery - Continuous miners introduced

1955 Mt. Keira Colliery changes official name Osborne-Wallsend to Kemira Colliery (7th.Feb)

1955 Kemira Colliery - Continuous Miners introduced (Joy 1CM3s)

1955 Bellambi jetty washed away

1955 Mt. Pleasant Colliery - operations cease 30th. Sept. ( equipment returned to Kemira Clly)

1957 Darkes Forest Ventilation Shaft commissioned

1957 Nebo Colliery - Shuttle cars introduced

1958 Wongawilli Colliery - Bulli seam found to exist in locally thickened area

1958 Kemira Colliery - Roof Bolters introduced in January (Fletcher)

1958 Kemira Colliery - Shuttle Cars introduced in September (Joy 10SCs)

1958 Tongarra Colliery - Coal to Tallawarra PS. (prod. 1945 - 26,000; 1951 - 40,000; 1958 - 70,000)

1959 Wongawilli Colliery - Incline replaced by Decline conveyor

1959 Coal Cliff Colliery - contract mining ceases

1960

1960 Pt. Kembla No.2 Colliery - belt fire kills one workman

1960 Pt. Kembla No.2 Colliery (5.6 kms from Unanderra), closes

1960 Kemira Colliery - Pick-up Loaders introduced (Joy 11Bu & 14BUs)

1961 Bellambi Colliery - modernisation included 2 large buildings ($400,000). Also washery built.

1961 Wongawilli Colliery - Bulli seam production commences

1961 Excelsior Colliery closes

1962 Appin Colliery commenced

1962 Excelsior No.2 Colliery closes

1963 Huntley Colliery - Central Haulage System links Wongawilli & Tongarra seams

1963 Coal Cliff Colliery - Longwall equipment installed

1964 Corrimal Colliery - taken over by AIS in March.

1964 Pt. Kembla No. 2 Colliery purchased by AIS & becomes part of Nebo Colliery

1964 Pt. Kembla No.2 Colliery - closes

1964 Coal Loader at Pt. Kembla commissioned

1964 Bulli Colliery - 300m vent shaft drilled. (currently 400 employees, working 3 shifts)

1964 Bulli Colliery - small explosion by oxy - acetylene torch burns one miner.

1965 Corrimal Colliery & Kemira Colliery connected by barrier bin. Corrimal incline closed.

1965 Coal Cliff Colliery - Longwall equipment withdrawn (unsuccessful)

1965 Metropolitan Colliery - purchased by AIS

1965 Kemira Colliery - May/June first successful installation of fully mechanised retreating longwall

1965 Sth Bulli Colliery - Longwall unit installed

1965 Bulli Colliery - Nov. 9th, fire u/g, 4 died.

1966 O'Brien's Drift - coal haulage commenced on 9/5/66

1966 Huntley Colliery - first export order using temporary washery

1966 Bulli Main Colliery - continues production.

1966 Metropolitan Colliery - mechanisation completed

1967 Corrimal Colliery - August, commenced hauling coal via Kemira Colliery

1968 Mt. Kembla Colliery - Front end loaders introduced - not successful

1968 Huntley Colliery - Main washery installed

1968 Dombarton Colliery - commences, (equipment transferred to Yellow Rock Colliery, 1971)

1969 Appin Colliery - first longwall installed

1970

1970  Yellow Rock Colliery - opens

1970 Mt. Kembla Colliery - closes 18th Sept.

1970 Sth Bulli Colliery - two additional longwall units installed

1970 Corrimal Colliery - No 3 Shaft commissioned (all coal output from here)

1971 Corrimal Colliery - experimental shortwall installed

1971 Darkes Forest Colliery - commences

1971 Dombarton Colliery closes

1972 Sth Clifton Colliery - closed by Clutha

1972 Nth Bulli Colliery - closed by Clutha

1972 Kemira Colliery - longwall mining ceases

1972 Westcliff Colliery - shaft sinking commences

1973 Sth Clifton Colliery - purchased by ?- re-opened

1973 Nth Bulli Colliery - purchased by ? -re-opened for short time

1975 Corrimal Colliery - August, Haulage Shaft completed, ceased hauling coal via Kemira Colliery.

1976 Westcliff Colliery - commences

1977 Wongawilli Colliery - Bulli seam production ceases.

1977 Kemira Colliery - connection from Wongawilli seam to Kemira Tunnel

1978  Tower Colliery commences

1979  Cordeaux Colliery commences

1979 Appin Colliery - 14 men killed in fire

1980

1980 Cordeaux Colliery - officially opened

1980 Westcliff Colliery - Methane Drainage commences

1980 Tower Colliery - commences production

1981 Appin Colliery - Methane Drainage commences

1982 Westcliff Colliery - Longwall mining commences

1982 Westcliff Colliery - pilot 1.2 MW turbine installed in Methane Plant

1982 Brimstone #2 Colliery - closes 21/5/82

1982 Valley #1 Colliery - No. 2 Entry - closes 21/5/82

1983 Avondale Colliery - closes 17/1/83

1983 Sth Clifton Colliery - closes 16/9/83

1983 Valley #3 Colliery - closes 13/12/83

1984 Sth Bulli Colliery - retrenches labour

1984 Westcliff Colliery - 15 MW Power Plant installed in Methane Drainage Plant

1985 Corrimal Colliery - closes 7/12/85

1986 Cordeaux Colliery merges with Corrimal Colliery

1987 Bulli Colliery - closes 15/5/87

1987 Avon Colliery - closes 26/6/87

1987 Yellow Rock Colliery - closes 26/6/87

1988 Kemira Colliery - longwall reintroduced.

1988 Tower Colliery - longwall commences.

1989 Metropolitan Colliery - Denehurst purchases from Savage Resources

1989 Tower Colliery - methane drainage commences.

1989 Huntley Colliery closes

1990

1991 Kemira Colliery - Fri. Sept.27th mining ceases.

1991 Wongawilli Colliery - mining in Bulli seam for Elouera roadways

1991 Cordeaux Colliery - produces largest amount of coal in any u/g coal mine in Australia.

1992 Appin Colliery - on site coal preparation plant starts.

1993 Elouera Colliery - established from consolidation of Wongawilli, Nebo & Kemira Collieries.

1993 Cordeaux Colliery - first of any u/g coal mine in Australia to receive accreditation AS3902

1995 Metropolitan Colliery - Denehurst acquires 90% interest.

Last Updated: 10 July 2017
Discuss this article
Log in to comment

Members

Log in

Log in

  • Forgot your password?
  • Forgot your username?
  • Create Account

TIMELINE

  • 1790 - 1850
  • 1850 - 1900
  • 1900 - 1950
  • 1950 - 2000
  • 2000 - NOW

Other Recent Updates

  • South Bulli Colliery
  • Nebo Colliery
  • Shoobert's Mine
  • Black Bob's
  • American Creek Colliery (Mt Kembla Shale, Nebo, Elouera)
  • Tower Colliery
  • Albert Colliery
  • Kemira Colliery
  • Austinmer Colliery (North Bulli Mine)
  • Osborne Wallsend Colliery
  • Bulli Colliery
  • Old Bulli Colliery
  • Bulli No.4 Colliery
  • Bulli (Old) Colliery
  • South Clifton Colliery
  • Corrimal Colliery
  • Bellambi Colliery
  • Box Vale Colliery
  • Bruce's Tunnel
  • Coal Cliff Colliery

Popular Searches...

  • Bulli Colliery
  • Central Bulli Colliery
  • Kemira Colliery
  • Albert Colliery
  • Osborne Wallsend Colliery
  • James Shoobert
  • Henry Osborne
  • Albert Coal Mine
  • Corrimal
  • Balgownie

Popular Pages

  • Corrimal Colliery
  • Old Bulli Colliery
  • Appin Colliery
  • Kemira Colliery
  • About the Project

Site Search



Support This Project

Please sign up to contribute and/or support the ongoing development of this community site.
MEMBERSHIP & SPONSOR OPTIONS

Top
Copyright © 2023 All rights reserved. Site design by inTouch web services. Site research by Sheldrill
1850 - 1900