|
Rev.0
Black Ball Colliery
1904 - 1911
Opened in Portions 82 and 83
Parish of Woonona in 1904.
The seam worked was 7 feet
(2.13m) thick and very dirty. From the site of the old pit top it was probably
the Plunketts Hill seam or perhaps the Tongarra.
from a paper by G. Sellers,
1976, The Illawarra Coalfield - A Brief History to 1905 presented at the AusIMM
Conference, Illawarra, 1976.
A small colliery working the
No. 6 Seam (Woonona seam) with the coal being disposed of locally. Coal quality
was relatively poor, work being abandoned in May, 1911 after the workings
reached a distance of some 70 yards (64 m).
Harper, L. F. F.G.S -
Geology and Mineral Resources of the Southern Coal-Field, Part 1, The South
Coastal Portion, Dept. of Mines, 1915.
|